|
-
Post-Release Reliability Growth in Software Products
( to appear in ACM Transactions on Software Engineering and Methodology.
-
On Optimum Size for Software Inspections
( International Journal of Reliability, Quality and Safety Engineering, Vol. 14, No. 3 (June 2007) 283-295.
-
An Approach for Experimentally Evaluating Effectiveness and Efficiency of Coverage Criteria for Software Testing
( to appear in Journal of Software Tools for Technology Transfer (STTT).
- The when-who-how analysis of defects for improving the quality control process
( Journal of Systems and Software, Vol 80(4), pp 584-589, Apr 2007.
-
An Experimental Evaluation of the Effectiveness and Efficiency of the Test-Driven Development,
( International Symposium on Experimental Software Engineering (ESEM 2007), Madrid, Sept 2007.
-
Test Inspected Unit or Inspect Unit Tested Code?
(International Symposium on Experimental Software Engineering (ESEM 2007), Madrid, Sept 2007)
-
Stabilization Time - A Quality Metric for Software Product,
( IEEE's Int. Symp. On Software Reliability (ISSRE2006), Nov 2006.
- Using Defect Analysis Feedback for Improving Quality and Productivity in Iterative Software Development(Invited paper,3rd Int. Conf. on Information and Communication Technology, ICICT, 2005.), Cairo, Dec 2005
- Assigining Tasks in a 24-Hour Software Development Model(Asia Pacific Software Engineering Conference(APSEC), Dec 2004.)
- Timeboxing: A process model for iterative software development Journal of Systems and Software, 2003. More details in, the chapter in Advances in Computers, Vol 6, 2004.
- Optimal Resource Allocation for the Quality Control Process(Int. Symp. on Software Reliability (ISSRE), 2003.)
- Optimum control limits for employing statistical process control in
software processes (IEEE Tran. on Sw Engg, Dec 2002.)
- Use of Metrics in High Maturity Organizations Software Quality Professional March 2002, (also SEPG2002, Seattle.)
- The success of the SPI efforts in India” (in Software Quality Professional March 2001.)
- Lessons learned in framework-based software process improvement (Keynote, ASPEC2002, Gold Coast, Australia, 2002.)
- Knowledge Infrastructure for Project Management (Chapter in Managing Software
Engineering Knowledge, Springer, To appear.)
- Quantitative quality management through defect prediction and statistical process control
(2nd World Quality Congress for Software, Japan, September 2000.)
- Moving from ISO to Higher levels of the CMM (SEPG'99 , Atlanta, 1999.)
- Overcoming the NAH syndrome for inspection deployment (ICSE, Kyoto, Japan, April 1998.)
|
|